You Spent 1,800 Hours Riveting Your Airframe. Don't Let a Messy Paperwork Binder Delay Your Pink Slip.
Your engine is hung, your avionics bus is pinned out, and your Designated Airworthiness Representative (DAR) inspection is 30 days away. Yet most homebuilders spend the final two weeks frantically stitching together broken forum spreadsheets, outdated AC 90-89B PDFs, and generic annual checklists that don't match their airframe's datum or Task-Based Phase I operating limitations.
Pre-calibrated datum & arm stations for RV-7/7A/8/10/14, Sling TSi & Kitfox S7 with live Aerobatic vs. Normal envelope plotting.
Generates kneeboard-ready test cards for all 17 FAA AC 90-89C flight test profiles with automated V-speed & CHT/EGT trend logging.
80+ zonal inspection checkpoints mapped to 14 CFR Part 43 Appendix D with torque specs, squawk disposition, and progress tracking.
One-click verbatim logbook endorsements for Phase I completion, Repairman Certificate inspection sign-offs, and Form 8130-6 letters.
40 Hours Lost to Broken Forum Spreadsheets
- ✕ Mismatched Reference Datums: Copy-pasting an anonymous Excel sheet with a 60-inch datum instead of Van's 70.0-inch forward-of-leading-edge datum corrupts your entire CG envelope.
- ✕ Obsolete Flight Test Handbooks: Showing up with a generic 40-hour time-drill binder that ignores the FAA's updated AC 90-89C Task-Based Phase I provisions.
- ✕ Non-Compliant Logbook Endorsements: Missing a single mandatory phrase required by your Operating Limitations when transitioning out of Phase I or signing off your annual condition inspection.
Inspection-Ready Binder in 15 Minutes
- ✓ Verified Airframe Templates: Select your exact model (RV-7, RV-8, RV-10, RV-14, Sling TSi, Kitfox S7) and enter your 3-wheel scale weights—empty CG and corner envelopes render immediately.
- ✓ Task-Based Phase I Syllabus: Every test card maps directly to AC 90-89C Chapters 1–4 with pre-flight briefings, stability/stall matrix tables, and VX/VY climb schedules.
- ✓ Offline Hangar Resilience: Runs in any tablet or desktop browser with local JSON snapshot persistence and clean print/PDF export for your physical aircraft binder.
Trusted in the Hangar from First Engine Start to Annual #10
"My DAR spent 12 minutes reviewing my AeroBuild W&B envelope and AC 90-89C Task-Based Flight Test Binder, smiled, and said it was the cleanest amateur-built documentation package he'd inspected all year."
"With 4 seats and baggage compartments, computing aft CG corner cases on the RV-10 during Phase I ballast testing used to take me an hour in Excel. Here it's interactive and prints straight to my kneeboard."
"The 14 CFR Part 43 Appendix D Condition Inspection tracker paid for itself on my very first annual with my Repairman Certificate. Every cotter pin, control cable tension check, and logbook endorsement is right there."
Simple, Builder-Friendly Pricing
Costs less than half a tank of 100LL Avgas. Saves 35+ hours of regulatory preparation.
DAR & W&B Core Pack
Net after LemonSqueezy ($2.95 fee): $46.05 (94.0% margin)
- ✓ 1 Airframe W&B & CG Envelope Solver
- ✓ FAA Form 8130-6 Program Letter Generator
- ✓ Basic 40-Hour Phase I Logbook Endorsement
- ✓ Printable DAR Binder PDF Export
Builder Complete Suite
Net after LemonSqueezy ($4.45 fee): $74.55 (94.4% margin)
- ✓ Everything in Core Pack, plus:
- ✓ Full 17-Card AC 90-89C Task-Based Phase I Flight Test Generator
- ✓ Interactive 14 CFR Part 43 Appendix D Annual Condition Inspection Checklist
- ✓ Repairman Certificate & Phase I/II Logbook Sign-Off Builder
- ✓ Lifetime JSON Backup & Multi-Airframe Profiles
Multi-Airframe Pro + Cloud
Net after LemonSqueezy ($5.45 fee): $93.55 (94.5% margin)
- ✓ Unlimited N-Number & Customer Aircraft Profiles
- ✓ Custom Datum & Arm Station Override Builder
- ✓ Automated Annual Inspection Due-Date Email Reminders
- ✓ EAA Technical Counselor Multi-Builder Review Export
60-Second DAR Airworthiness Inspection Readiness Scorecard
Check off the 5 mandatory FAA Order 8130.2J & AC 90-89C items below to calculate your immediate DAR readiness score and unlock a free sample Phase I Flight Test Card PDF.
Frequently Asked Technical Questions
1. Does this support the FAA's Task-Based Phase I flight test program under AC 90-89C?
Yes. In addition to traditional 25-hour (certificated engine/propeller combination) and 40-hour operating limitation schedules, Module 2 generates the complete 17-task test card syllabus aligned with FAA Advisory Circular AC 90-89C and FAA Order 8130.2J so you can document each flight test objective methodically.
2. Can I customize the empty-weight CG arms if my battery or ELT is mounted in a custom location?
Absolutely. While we pre-load the exact factory reference datum and station arms for Van's RV-7/7A/8/10/14, Sling TSi, and Kitfox S7, every weight station arm (in inches aft of datum) and empty-weight moment is editable in real time.
3. Does my data stay private, and does it work offline in a metal hangar?
Yes. The entire application executes client-side in your browser with zero cloud latency, saves state locally, and allows one-click JSON file export/import plus native print/PDF binder generation.